Sierra Mojada Leach zinc mine
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
- Key Issues
- Emissions
- Mining
- Processing
- Royalties and taxes
- Mineral concessions
Tables and charts
This report includes the following images and tables:
- Sierra Mojada Emission Intensity Quartile Ranking - Total global production - Tonnes Zn equivalent
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Colquijirca (El Brocal) copper mine
A detailed cost competitive analysis of the Colquijirca (El Brocal) copper mine.
$2,250Triple Seven copper mine
A detailed analysis of the Triple Seven copper mine.
$2,250Eva copper mine project
A detailed analysis of the Eva copper mine project.
$2,250