Asset Report

Sleeper gold mine project

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

The Sleeper project is a former high-grade open pit operation. A Preliminary Economic Assessment was completed in December 2015 with the aim to restart operations treating relatively low grade ore by heap leaching process methods. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Mining
  • Processing

Tables and charts

This report includes 1 images and tables including:

  • Detailed map

What's included

This report contains:

  • Document

    Sleeper gold mine project

    XLS 123.00 KB

  • Document

    Sleeper gold mine project

    PDF 1.25 MB

  • Document

    Sleeper gold mine project

    ZIP 1.04 MB