Asset Report
Sungun copper mine
Report summary
Sungun is a large open pit operation 2,200km from NICICO's Sarcheshmeh copper complex. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Key issues
- Operating
- CAPEX
- Mining
-
Process
- Copper Concentrator
- Molybdenum Circuit
- Copper Smelter
- Slag Concentrator
- Byvlychyng Cathode Plant
- Heap leach project
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Black Butte copper mine project
A detailed analysis of the Black Butte copper mine project.
$2,250
Asset Report
Yellowhead copper mine project
A detailed analysis of the Yellowhead copper mine project.
$2,250
Asset Report
Milpillas SxEw copper mine
A detailed production and cost competitive analysis of the Milpillas SxEw copper mine.
$2,250