Asset report

Suyai (Esquel) gold mine project

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

The project was to comprise underground mining and a concentrator. A throughput rate of 450kt/a was assumed. Due to the early stage of the project and the strong local opposition to the development of the project the analysis is indicative only.

What's included

This report contains

  • Document

    Suyai (Esquel) Project gold mine

    XLS 122.00 KB

  • Document

    Suyai (Esquel) gold mine project

    PDF 584.88 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Geology
  • Reserves and resources
  • Operations
  • Costs
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in?

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898