Asset report

Taifeng zinc smelter

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about subscriptions

Already have subscription? Sign In

Further information

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image

Report summary

The Taifeng smelter was commissioned in 2002 with a capacity of 45kt/a. In 2008, construction began on a 60kt/a expansion of the smelter to raise the capacity to 105kt/a slab zinc. The new plant was commissioned in January 2012.

What's included

This report contains

  • Document

    Taifeng zinc smelter

    PDF 752.11 KB

  • Document

    Taifeng zinc smelter.xls

    XLS 505.50 KB

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Location maps
  • Participation
  • Process overview
  • Products
  • Costs
  • Timeline
  • Economic assumptions

Tables and charts

This report includes 14 images and tables including:

Images

  • Location maps: Image 1
  • Flowsheet
  • Products: Image 1
  • Costs: Image 1

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Process overview: Table 1
  • Process overview: Table 2
  • Process overview: Table 3
  • Process overview: Table 4
  • Products: Table 1
  • Products: Table 2
  • Costs: Table 1
  • Economic assumptions: Table 1

You may be interested in

    
            
            
            
            
            
            
            
            
            
            
            
    

Questions about this report?

    • Europe:
      +44 131 243 4699
    • Americas:
      +1 713 470 1900
    • Asia Pacific:
      +61 2 8224 8898