Asset report

Torreon zinc smelter

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

The zinc smelter was commissioned in 1973 with a capacity of 100kt/a the original earlier site operation comprising a lead silver smelting plant only. It now forms part of an integrated metallurgical complex including lead smelter lead refinery silver refinery and other by product plants. It is supported by the Bermejillo Plant which produces zinc oxide zinc dust zinc sulphate cadmium oxide copper sulphate and antimony oxide. In 1994 the Aleazinc zinc alloys plant in Ramos Arizpe...

What's included

This report contains

  • Document

    Torreon zinc smelter

    PDF 721.86 KB

  • Document

    Torreon zinc smelter.xls

    XLS 546.50 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Projects
  • Location maps
  • Participation
  • Process overview
  • Products
  • Costs
  • Economic assumptions

Tables and charts

This report includes 14 images and tables including:

Images

  • Location maps: Image 1
  • Flowsheet
  • Products: Image 1
  • Costs: Image 1

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Process overview: Table 1
  • Process overview: Table 2
  • Process overview: Table 3
  • Process overview: Table 4
  • Products: Table 1
  • Products: Table 2
  • Costs: Table 1
  • Economic assumptions: Table 1

You may be interested in

    
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898