Report summary
Production is from the Target 1 deposit. Mining extends to a depth of nearly 3km and is mainly by mechanised massive mining methods. Labour intensive methods are still used mainly to de-stress zones before mechanised mining. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
-
Key issues
- Detailed map
- Mining
- Processing
Tables and charts
This report includes 1 images and tables including:
What's included
This report contains:
Other reports you may be interested in
Asset Report
President Steyn (Closed) gold mine
A detailed analysis of the President Steyn (Closed) gold mine.
$2,250
Asset Report
Pierre Beauchemin (Closed) gold mine
A detailed analysis of the Pierre Beauchemin (Closed) gold mine.
$2,250
Asset Report
Rand (Yellow Aster & Baltic) (Closed) gold mine
A detailed analysis of the Rand (Yellow Aster & Baltic) (Closed) gold mine.
$2,250