Asset Report
Teghout copper mine
Report summary
Teghout is an open pit copper-molybdenum mine which was commissioned in 2015. Following suspension pending tailings facility upgrades in 2018, the operation re-started in 2019. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Key issues
- Mining
- Processing
Tables and charts
This report includes 1 images and tables including:
What's included
This report contains:
Other reports you may be interested in
Asset Report
Bracemac-McLeod copper mine
A detailed analysis of the Bracemac-McLeod copper mine.
$2,250
Asset Report
Ridder (Leninogorsk) copper mine
A detailed analysis of the Ridder (Leninogorsk) copper mine.
$2,250
Asset Report
Highland Valley copper mine
A detailed analysis of the of the Highland Valley copper mine.
$2,250