Asset Report

Timan bauxite mine

Get this report*

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

Timan supplies UC Rusal's Russian-based refineries, including Bauxitogorsk, Bogoslovsk and Uralsk, and would supply the currently deferred Komi project. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key issues
  • Emissions
  • Mining
  • Process

Tables and charts

This report includes 2 images and tables including:

  • Timan Emission Intensity Quartile Ranking - total global production - tonnes of bauxite
  • Detailed map

What's included

This report contains:

  • Document

    Timan bauxite mine

    XLS 90.00 KB

  • Document

    Timan bauxite mine

    PDF 1.61 MB