Report summary
Before closing in 2012, Tintaya was operating a 20kt/d ore concentrator supported by an open pit. It also operated a 34kt/a cathode SxEw plant until 2013 when it closed. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Key issues
- CAPEX
- Mining
-
Process
- Mill
- Leach / SxEw
- Royalties
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains: