Asset Report

Tintaya copper minesite

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

Before closing in 2012, Tintaya was operating a 20kt/d ore concentrator supported by an open pit. It also operated a 34kt/a cathode SxEw plant until 2013 when it closed. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key issues
  • CAPEX
  • Mining
    • Mill
    • Leach / SxEw
  • Royalties

Tables and charts

This report includes 1 images and tables including:

  • Detailed map

What's included

This report contains:

  • Document

    Tintaya copper minesite

    XLS 384.50 KB

  • Document

    Tintaya copper minesite

    PDF 1.27 MB