Asset Report
Tongling Ausmelt copper refinery
Report summary
Tongling Ausmelt copper refinery is the relocation project of the former Tongling Jinchang refinery. It is located adjacent to Tongling's "Double Flash" project in Tongling city, Anhui province, with the designed production capacity is 200 ktpa cathode copper. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Tankhouse
- Casting plant
Tables and charts
This report includes 2 images and tables including:
What's included
This report contains:
Other reports you may be interested in
Asset Report
Tongling Ausmelt copper smelter
A detailed analysis of the Tongling Ausmelt copper smelter.
$2,250
Asset Report
Tongling (Jinguan) copper refinery
A detailed analysis of the Tongling (Jinguan) copper refinery.
$2,250
Asset Report
Tongling (Jinchang) (closed) copper refinery
A detailed analysis of the Tongling (Jinchang) copper refinery.
$2,250