Asset Report

Tongling Ausmelt copper smelter

Get this report*

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

Tongling Ausmelt copper smelter is the relocation project of the former Tongling Jinchang smelter. It is located adjacent to Tongling's "Double Flash" project in Tongling city, Anhui province, with a total investment of ¥3.3 billion. the designed production capacity is 200 ktpa cathode copper and 763 ktpa sulfuric acid. The relocation project was started in March 2016 and was commissioned in March 2018. the Ausmelt furnace was put into operation in May and the production ramped up in the next months.

Table of contents

  • Emissions
  • Flowsheet
  • Feed preparation
  • Smelting process
  • Auxiliary plants

Tables and charts

This report includes 6 images and tables including:

  • Tongling Ausmelt Emission Intensity Quartile Ranking - total global production - tonnes Cu
  • Detailed map

What's included

This report contains:

  • Document

    Tongling Ausmelt copper smelter

    PDF 1.76 MB