Asset report

Toroparu gold mine project

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

Toroparu is a gold deposit with silver and copper as by products. The Toroparu project is planned as an open pit operation utilising conventional mining methods. Total mine life is estimated at 16 years with a Life of Mine (LOM) strip ratio of 3.69:1. The process plant will comprise a carbon in pulp (CIP) circuit and is designed to recover gold silver and copper from the mineralised material. Plant capacity is expected to increase from 6Mt/a 8.5Mt/a in year 4 of operation.

What's included

This report contains

  • Document

    Toroparu Project gold mine

    XLS 128.50 KB

  • Document

    Toroparu gold mine project

    PDF 760.77 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Geology
  • Reserves and resources
  • Operations
  • Sales contracts
  • Infrastructure
  • Costs
  • Fiscal and regulatory
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in?

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898