Asset Report

Toroparu gold mine project 

From

$1,350.00

You can pay by card or invoice

From

$1,350.00

You can pay by card or invoice

Get this Asset Report as part of a subscription

Enquire about subscriptions

Already have a subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

Report summary

Toroparu is a gold deposit with silver and copper as by-products. The Toroparu project is planned as an open pit operation utilising conventional mining methods. Total mine life is estimated at 16 years with a Life of Mine (LOM) strip ratio of 3.69:1. The process plant will comprise a carbon in pulp (CIP) circuit and is designed to recover gold, silver and copper from the mineralised material. Plant capacity is expected to increase from 6Mt/a-8.5Mt/a in year 4 of operation.

What's included

This report contains

  • Document

    Toroparu Project gold mine

    XLS 128.50 KB

  • Document

    Toroparu gold mine project

    PDF 761.99 KB

Table of contents

Tables and charts

This report includes 2 images and tables including:

Tables

  • Key facts: Table 1

Images

  • Detailed map

You may be interested in

Questions about this report?

  • Europe:
    +44 131 243 4400
  • Americas:
    +1 713 470 1600
  • Asia Pacific:
    +65 6518 0800