Asset Report

Toroparu Gold Mine Project

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

Toroparu is a gold deposit with silver and copper as by-products. The Toroparu project is planned as an open pit operation utilising conventional mining methods with underground mining contributing from year 10 onwards. Total mine life is estimated at 24 years with a Life of Mine (LOM) open pit strip ratio of 5.99:1 with production expected in 2024. The process plant will be constructed in two phases. Throughout Phase 1, the processing capacity of the plant will be 7000tpd. It will comprise a gravity and CIL circuit. After 10 years, a 7000tpd parallel flotation plant will be added. The mine will produce Au-Ag dore and Au-Cu concentrate.

Table of contents

  • Summary
  • Key issues
  • Mining
  • Processing
  • Royalty Streams
  • Power
  • CAPEX
  • Royalties & Taxes

Tables and charts

This report includes 1 images and tables including:

  • Detailed map

What's included

This report contains:

  • Document

    Toroparu Project gold mine

    XLS 122.00 KB

  • Document

    Toroparu Gold Mine Project

    PDF 1.13 MB

  • Document

    Toroparu gold mine project

    ZIP 961.13 KB