Asset report

Townsville zinc smelter

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

In the early 1990s Korea Zinc started studying the feasibility of building a new zinc smelter in Australia to service the growing Asia Pacific markets. Sites at either Gladstone or Townsville had been considered the final choice being the latter. The smelter is located on the coast making it a custom smelter close to Australian sources of feed but not wholly dependent upon them. The majority of the product zinc is exported. In 1998 Korea Zinc indicated an interest in selling a share...

What's included

This report contains

  • Document

    Townsville zinc smelter

    PDF 683.97 KB

  • Document

    Townsville zinc smelter.xls

    XLS 517.50 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Projects
  • Location maps
  • Participation
  • Process overview
  • Products
  • Costs
  • Economic assumptions

Tables and charts

This report includes 14 images and tables including:

Images

  • Location maps: Image 1
  • Flowsheet
  • Products: Image 1
  • Costs: Image 1

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Process overview: Table 1
  • Process overview: Table 2
  • Process overview: Table 3
  • Process overview: Table 4
  • Products: Table 1
  • Products: Table 2
  • Costs: Table 1
  • Economic assumptions: Table 1

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898