Asset Report
Trojan nickel operation
Report summary
A fully integrated facility with electric furnace smelter and leach electrowin refinery. The smelter and refinery ceased production in 2009 and the company was evaluating options to restart the smelter. Mining recommenced in 2013 from the Trojan mine. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Mining
-
Process
- Cashflow
Tables and charts
This report includes 4 images and tables including:
What's included
This report contains:
Other reports you may be interested in
Asset Report
Avebury restart nickel operation
A detailed analysis of the Avebury restart nickel project.
$2,250
Asset Report
Black Swan / Silver Swan (inc. Cygnet) / Golden Swan nickel project
A detailed analysis of the Black Swan / Silver Swan (inc. Cygnet) / Golden Swan nickel project.
$2,250
Asset Report
Pomalaa nickel operation
A detailed analysis of the Pomalaa nickel operation.
$2,250