Asset Report
Tsumeb copper mine
Report summary
Ore from Tsumeb West and Tschudi underground was treated at the Tsumeb concentrator. The Kombat mine and concentrator are included in this analysis up to mid-2007 when the mine was due to flooding. The development of an open pit SxEw project at Tschudi is analysed seperately. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Mining
- Process
Tables and charts
No table or charts specified
What's included
This report contains:
Other reports you may be interested in
Asset Report
Tschudi SxEw copper mine
A detailed analysis of the Tschudi SxEw copper mine.
$2,250
Asset Report
Mt Garnet (Copper Plant) copper mine
A detailed analysis of the Mt Garnet (Copper Plant) copper mine.
$2,250
Asset Report
Black Butte copper mine project
A detailed analysis of the Black Butte copper mine project.
$2,250