Asset Report

Tulawaka (Closed) gold mine

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

African Barrick operations in Tanzania have been affected by social licence issues. The mine is situated 100km from the Bulyanhulu mine and Barrick estimates that regional infrastructural synergies are worth $1M/a to the company. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key Issues
  • Mining
  • Process

Tables and charts

This report includes 1 images and tables including:

  • Detailed map

What's included

This report contains:

  • Document

    Tulawaka gold mine

    XLS 115.00 KB

  • Document

    Tulawaka (Closed) gold mine

    PDF 1.21 MB

  • Document

    Tulawaka (Closed) gold mine

    ZIP 1.03 MB