Asset Report

West Hydropower aluminium smelter

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

The Minhe smelter was commissioned in 2011. Its ramp up was incremental, reaching nameplate capacity six years later. The operator owns an anode plant through a joint venture. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key issues
  • Alumina Sources
  • Anode Source

Tables and charts

This report includes 2 images and tables including:

  • Cell technology

What's included

This report contains:

  • Document

    Minhe (Aluminium) aluminium smelter

    XLS 151.00 KB

  • Document

    West Hydropower aluminium smelter

    PDF 1.28 MB

  • Document

    Minhe (Aluminium) aluminium smelter

    ZIP 1.09 MB