Asset Report
Willowdale bauxite mine
Report summary
Willowdale was commissioned in 1984 and is the smaller of the two remaining mine sites in Alcoa's Darling Range operations.Capacity is about 9Mtpa. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Key issues
- Mining
- Process
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
06 December 2022
Rainy River gold mine project
Asset Report
Rainy River gold mine project
A detailed analysis of the Rainy River gold mine project.
$2,25006 January 2023
Discovery Bay bauxite mine
Asset Report
Discovery Bay bauxite mine
A detailed analysis of the Discovery Bay bauxite mine.
$2,25006 January 2023
Boddington bauxite mine
Asset Report
Boddington bauxite mine
A detailed analysis of the Boddington bauxite mine.
$2,250