Wood Mackenzie 2025 Webinar - Bulks in Flux: from Coal to Green Steel
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- No table of contents specified
Tables and charts
No table or charts specified
What's included
This report contains:
Other reports you may be interested in
Yifeng Shiziling - Lithium mine
A detailed analysis of the Yifeng Shiziling lithium mineral operation.
$2,250Tsingshan Morowali nickel operation
Tsingshan Indonesia's Morowali Industrial Park NPI production profile and costing
$2,250Springvale coal mine
A detailed analysis of the Springvale coal mine.
$2,550