Zouerate System iron ore mine
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
- Key issues
Tables and charts
This report includes the following images and tables:
- Detail map
- Participation
- Marketable reserves (01/01/2024)
- Production
- Operations
- Infrastructure
- Cash costs
- Capital costs
- Product quality
- Economic assumptions
What's included
This report contains:
Other reports you may be interested in
Minas Centrais (Southeastern System) iron ore mine
A complex owned by Vale with one operating mine, Brucutu. Running below its capacity as a result of constraints in tailings disposal.
$2,250Solomon Hub iron ore mine
Production at FMG's Solomon Hub will fall as Firetail winds down and the new Eliwana mine ramps up.
$2,250Eliwana iron ore mine
FMG's 30 Mtpa Eliwana ramped up and is expected to be its lowest cost operation.
$2,250