Insight

Trans Mountain DRA expansion work progressing

Get this report*

$1,350

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

Pipeline expansions out of Western Canada continue to make headlines, with multiple greenfield and brownfield options either underway or being considered. This includes Trans Mountain's DRA Project, which is expected to boost the overall system's pipeline capacity by 10% by the beginning of 2027 via the use of drag reducing agents (DRAs). Wood Mackenzie recently captured imagery of the DRA skid installations during early September to assess the progress following the start of the work earlier this summer. In this Insight report, we provide imagery of multiple of the DRA skid installations, takeaways from the imagery, and background information regarding the expansion.

Table of contents

  • Trans Mountain installing DRA skids; 90 kb/d capacity increase targeted by year-end

Tables and charts

This report includes the following images and tables:

    DRA skid installed at the Blackpool pump stationDRA skid installed at the Darfield pump stationDRA skid installed at the Hinton pump station
    DRA skid installed at the McMurphy pump stationDRA skid installed at the Chappel pump stationDRA skid installed at the Finn pump stationDRA skid installed at the Kingsvale pump stationDRA skid installed at the Blue River pump station

What's included

This report contains:

  • Document

    Trans Mountain DRA Expansion Work Progressing.pdf

    PDF 1.21 MB