Coronavirus lowers 2020 APAC storage additions by 21%, down 1.9 GWh
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- No table of contents specified
Tables and charts
No table or charts specified
What's included
This report contains:
Other reports you may be interested in
Suprabari Mapanindo Mineral coal mine
Detailed asset level data for the Suprabari Mapanindo Mineral coal mine
$2,550Guixi copper smelter
A detailed analysis of the Guixi copper smelter.
$2,250Luoyang bauxite mine
A detailed analysis of the Luoyang bauxite mine.
$2,250