Has coal power generation peaked in the ASEAN region?
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- No table of contents specified
Tables and charts
No table or charts specified
What's included
This report contains:
Other reports you may be interested in
Insights from Solar & Energy Storage Future Malaysia (SESFM) 2025: Navigating policy evolution and investment opportunities
From policy shifts to storage breakthroughs, Malaysia’s solar power sector is accelerating fast.
$3,000Xinjiang Shenhuo aluminium smelter
A detailed analysis of the Xinjiang Shenhuo aluminium smelter.
$2,250Qineng (Aluminium) aluminium smelter
As the largest smelters in Chongqing, Qineng smelter was designed to 330 ktpa aluminium capacity with 2×330MW captive power plant.
$2,250