Asset Report

A/6-F/3 Pipeline

Get this report

$2,150

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQ's about online orders
- Find out more about subscriptions

20 June 2019

A/6-F/3 Pipeline

Report summary

The A/6-F/3 gas gathering system was built to transport gas from the German A/6-B/4 gas field and potential field developments in the far north of the Dutch sector. In addition to the gas pipeline, a condensate pipeline was also constructed. The A/6-F/3 pipeline has been routed via the Tertiary shallow gas fields in the A and B quadrants in the Netherlands. Production from this area started in December 2007. The Hanze field was connected to the A/6-F/3 pipeline when it was brought onstream ...

Table of contents

Tables and charts

This report includes 18 images and tables including:

  • Key facts: Table 1
  • A/6-F/3 pipeline Map
  • Participation: Table 1
  • Throughput: Table 1
  • Throughput: Table 2
  • Gas Throughput Profile
  • Cash Flow (US$ million)
  • Economic analysis: Table 2
  • Economic analysis: Table 3
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2019
  • Remaining Revenue Distribution (Discounted at 10% from 01/01/2019)
  • Cash Flow ( million)
  • Economic analysis: Table 5
  • Economic analysis: Table 6
  • Costs: Table 1
  • Costs: Table 2

What's included

This report contains:

  • Document

    A/6-F/3 Pipeline

    PDF 1.05 MB

  • Document

    A/6-F/3 Pipeline

    XLS 329.00 KB

  • Document

    A/6-F/3 Pipeline

    ZIP 1008.25 KB

Trusted by leading organisations