Report summary
The Liverpool Bay project is located in the East Irish Sea. It consists of six fields: Douglas, Douglas West, Hamilton, Hamilton East, Hamilton North and Lennox. The main hub, Douglas, is located approximately 30 kilometres south of the Morecambe hub. It consists of three bridge-linked platforms housing drilling, processing and accommodation separately. The Lennox oil and gas field, located 25 kilometres northeast of the main hub, has been developed via a simple Normally Unmanned ...
Table of contents
- Key facts
-
Summary and key issues
- Summary
-
Key issues
- The operator is looking at the feasibility of carbon capture and storage at the depleted fields
- Cessation of production (CoP)
- Location maps
- Participation
- Geology
- Well data
- Exploration
- Reserves and resources
- Production
-
Development
-
Douglas and Douglas West
- Wells
- Facilities
- Platform modifications
-
Hamilton, Hamilton North and Hamilton East
- Wells
- Platform
-
Lennox
- Wells
- Platform
- Carbon capture and storage potential - HyNet project
-
Douglas and Douglas West
- Infrastructure
-
Costs
- Capital costs
- Decommissioning costs
-
Operating costs
- Emissions Trading Scheme (ETS)
-
Sales contracts
- Gas
- Fiscal and regulatory
-
Economic assumptions
- Cash flow
- Discount rate and date
- Inflation rate
- Oil price
- Gas price
- Carbon price
- Exchange rate
- Fiscal terms
- Global Economic Model (GEM) file
-
Economic analysis
- Cash Flow
Tables and charts
This report includes 34 images and tables including:
- Key facts: Table 1
- Index map
- Liverpool Bay Area map
- Participation: Table 1
- Geology: Table 1
- Well data: Table 1
- Exploration: Table 1
- Reserves and resources: Table 1
- Production: Table 1
- Production: Table 2
- Liverpool Bay production profile
- Infrastructure: Table 1
- Douglas and Douglas West
- Costs: Table 2
- Hamilton, Hamilton North and Hamilton East
- Costs: Table 4
- Lennox
- Costs: Table 6
- Costs: Table 7
- Sales contracts: Table 1
- Cash flow (US$ million)
- Economic analysis: Table 2
- Economic analysis: Table 3
- Split of Revenues
- Cumulative Net Cash Flow - Undiscounted
- Cumulative Net Cash Flow - Discounted at 10% from 01/01/2024
- Remaining Present Value Price Sensitivities
- Cash flow (£ million)
- Economic analysis: Table 5
- Economic analysis: Table 6
- Development: Table 1
- Development: Table 2
- Costs: Table 8
- Tariff receipts
What's included
This report contains:
Other reports you may be interested in
Asset Report
Point of Ayr Gas Terminal
The Point of Ayr Gas terminal lies in Flintshire, North Wales, at the mouth of the Dee estuary, and receives gas from the Liverpool Bay ...
$2,150
Asset Report
UK WoB ceased fields
This report covers fields that have ceased producing in the West of Britain (WoB). High profile fields, those undergoing ...
$3,100
Asset Report
Tangguh (LNG)
Largest gas producing asset in Indonesia is expecting first gas from Expansion phase and will FID a CCUS-EGR facility
$5,750