Aban and West Paydar (IPC)
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
- Key Issues
- Field structure
- Emissions
-
Phase 1: Remediation and improved oil recovery (2022-2024)
- Wells
- Processing facilities
-
Phase 2: Accelerated development (2025-2030)
- Subsurface evaluation
- Drilling programme
- Phase 3: Plateau maintenance and optimisation (2030 onwards)
- Capital costs
-
Operating costs
- Depreciation
- Cash flow
- Global Economic Model (GEM) file
- Cash Flow
Tables and charts
This report includes the following images and tables:
-
Index mapDetail mapParticipation
-
Hydrocarbon and reservoir characteristicsReserves (2P) at 01/01/2026Production (2018-2024)Production profilePipeline summaryCapital Costs Pre-2016 to 2024 (US$ million)Operating Costs 2025 to 2029 (US$ million)Domestic gas prices
- 7 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Philippines other fields
We detail some of the other fields in the Philippines that are onstream, shut-in, or likely to be developed in the near term.
$3,720Ichthys LNG - upstream
Ichthys is a giant gas-condensate field that was brought onstream in 2018 via an integrated LNG development.
$6,900Shams Contract Area (Block 44)
Block 44 (Shams contract area) is in northwest Oman, approximately 250 kilometres west of Muscat. It is operated by a local Omani ...
$3,720