Aban and West Paydar (IPC)
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
- Key Issues
- Field structure
- Emissions
-
Phase 1: Remediation and improved oil recovery (2022-2024)
- Wells
- Processing facilities
-
Phase 2: Accelerated development (2025-2030)
- Subsurface evaluation
- Drilling programme
- Phase 3: Plateau maintenance and optimisation (2030 onwards)
- Capital costs
-
Operating costs
- Depreciation
- Cash flow
- Global Economic Model (GEM) file
- Cash Flow
Tables and charts
This report includes the following images and tables:
- Index map
- Detail map
- Participation
- Hydrocarbon and reservoir characteristics
- Reserves (2P) at 01/01/2026
- Production (2018-2024)
- Production profile
- Pipeline summary
- Capital Costs Pre-2016 to 2024 (US$ million)
- Operating Costs 2025 to 2029 (US$ million)
- Domestic gas prices
- 7 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Carito-Mulata
Carito-Mulata is a giant, deep onshore reservoir located in eastern Venezuela north of the Monagas basin. The fields are sub-divided ...
$3,720Yaran Phase 2 (IPC)
The Yaran field is located 95 kilometres west of Ahvaz and adjacent to the Iraqi border. The field is shared with Iraq where it is ...
$3,720Iran other fields (sub-commercial)
Data on the fields we currently classify as sub-commercial are available below. Sub-commercial fields contain hydrocarbon volumes that ...
$3,720