Aban and West Paydar (IPC)
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
- Key Issues
- Field structure
- Emissions
-
Phase 1: Remediation and improved oil recovery (2022-2024)
- Wells
- Processing facilities
-
Phase 2: Accelerated development (2025-2030)
- Subsurface evaluation
- Drilling programme
- Phase 3: Plateau maintenance and optimisation (2030 onwards)
- Capital costs
-
Operating costs
- Depreciation
- Cash flow
- Global Economic Model (GEM) file
- Cash Flow
Tables and charts
This report includes the following images and tables:
-
Index mapDetail mapParticipation
-
Hydrocarbon and reservoir characteristicsReserves (2P) at 01/01/2026Production (2018-2024)Production profilePipeline summaryCapital Costs Pre-2016 to 2024 (US$ million)Operating Costs 2025 to 2029 (US$ million)Domestic gas prices
- 7 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Bukha Contract Area (Block 8)
Block 8 (Bukha Contract Area) covers two separate areas surrounding the producing Bukha and West Bukha fields, located offshore Oman.
$3,720IPC Paris basin fields
International Petroleum Corp (IPC) is one of the leading upstream producers in France. Its operated portfolio consists of oil fields in ...
$3,720Kuparuk (Kuparuk River Unit)
The Kuparuk field is located 56 kilometres west of Prudhoe Bay and is the second largest oil field on Alaska's North Slope. The ...
$3,720