Adrar Integrated Project
This report is currently unavailable
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
- Key Issues
-
Emissions
- Adrar refinery
- Drilling
- Capital costs
- Operating costs
- Cash flow
- Global Economic Model (GEM) File
- Cash Flow
Tables and charts
This report includes the following images and tables:
-
Index MapAdrar Integrated Project MapParticipation
-
Discovery wellsReserves (2P) at 01/01/2026Contingent Resources (2C) at 01/01/2026Production (2015-2024)Production ProfileCapital Costs Pre-2016 to 2024 (US$ million)Operating Costs 2025 to 2029 (US$ million)Cash Flow (US$)PV Table (US$)
- 6 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Yemen LNG - Upstream
Yemen LNG (YLNG) project consists of two identical trains, each with a production capacity of 3.35 mmtpa. The LNG plant is located at ...
$3,720Espirito Santo Basin - Other Fields
The Espírito Santo Basin - Other Fields are low priority assets for Petrobras due to their small sizes. The offshore assets, ...
$3,720P`nyang Area
The P`nyang Area will be developed as backfill for the PNG LNG plant.
$3,720