Asset Report
Bajo del Choique-La Invernada
This report is currently unavailable
Report summary
The Bajo del Choique and La Invernada fields were discovered in 2014 by ExxonMobil. At the time, the discovery wells registered the highest initial production rates from the Vaca Muerta shale formation. The blocks are operated as a single development, mostly in the light oil window of the Vaca Muerta shale. The operator has finalised its pilot commitments and had announced in 2019 that it would shift to full-development. We consider that changes to domestic and international market ...
Table of contents
- Key facts
-
Summary and key issues
- Summary
- Location maps
-
Participation
- Historic
- Geology
- Well data
- Exploration
- Reserves and resources
- Production
- Development
-
Infrastructure
- Gas
- Liquids
- Water
-
Costs
- Capital costs
- Operating costs
-
Sales contracts
- Gas
- Liquids
- Fiscal and regulatory
-
Economic assumptions
- Cash flow
- Discount rate and date
- Inflation rate
- Oil price
- Economic analysis
Tables and charts
This report includes 23 images and tables including:
- Key facts: Table 1
- Index Map
- Detail Map
- Participation: Table 1
- Geology: Table 1
- Well data: Table 1
- Reserves and resources: Table 1
- Production: Table 1
- Production: Table 2
- Production Profile
- Cash flow
- Economic analysis: Table 2
- Economic analysis: Table 3
- Split of Revenues
- Cumulative Net Cash Flow - Undiscounted
- Cumulative Net Cash Flow - Discounted at 10% from 01/01/2024
- Remaining Revenue Distribution (Discounted at 10% from 01/01/2024)
- Economic analysis: Table 4
- Remaining PV Price Sensitivities
- Costs: Table 1
- Costs: Table 2
- Costs: Table 3
- Sales contracts: Table 1
What's included
This report contains:
Other reports you may be interested in
Asset Report
Ruta del Cobre copper mine project
A detailed analysis of the Ruta del Cobre copper mine project.
$2,250
Asset Report
La Camorra (Mina Isadora) (Closed) gold mine
A detailed analysis of the La Camorra (Mina Isadora) gold mine.
$2,250
Asset Report
La Cascada SxEw copper mine
A detailed analysis of the La Cascada SxEw copper mine.
$2,250