Block 11/19 (Ceased)
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key Issues
- Subsea
- Further details
- Bozhong 25-1/25-1S
- Phase 1
- Phase 2A
- Phase 2B
- Bozhong 19-4
- Bozhong 19-4 expansion project
- 3 more item(s)...
- Cash Flow
- Global Economic Model (GEM) file
- Cash Flow
Tables and charts
This report includes the following images and tables:
- Index Map
- Detail Map
- Reserves (2P) at 01/01/2026
- Production (2015-2024)
- Production Profile for BZ 25-1/25-1S (11/19) and BZ 19-4
- Cash Flow (US$)
- PV Table (US$)
- Summary Table (US$)
- Split of Revenues
- Cumulative Net Cash Flow - Undiscounted
- 5 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Block 16 (Sangu) (Ceased)
Sangu is the first privately operated gas field brought onstream in Bangladesh, and the only producing offshore asset in the country. ...
$3,720PM305 & PM314 (Ceased)
Block PM305 & PM314 are located off the east coast of Peninsular Malaysia consisting of South Angsi, Kuning and Murai, currently ceased ...
$3,720Rehmat (Ceased)
The Rehmat gas field was discovered in July 2001 by Petronas Carigali, and came onstream in 2005. The field is located in northern ...
$3,720