Asset Report

Block 12W (Chim Sao and Dua)

Get this report

$5,750

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

Block 12W contains two oil discoveries, Chim Sao (formerly known as Blackbird) and Dua, in the Nam Con Son Basin. Both fields also contain associated gas. The original development plan for Chim Sao and Dua included two wellhead platforms, an FPSO and a gas pipe to the Nam Con Son pipeline. To reduce costs, the development plan was re-engineered during 2009 to include a single wellhead platform over the Chim Sao field, with additional subsea completions.

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Location maps
    • Recent participation changes
    • Historical participation
  • Well data
    • 1974-1980
    • 1996-2002
    • 2006-2012
  • Reserves and resources
  • Production
    • Chim Sao and Dua
    • Key Development Metrics
    • Gas
  • Infrastructure
    • Capital Costs
      • Chim Sao field
      • Dua field
      • Decommissioning
    • Operating Costs
  • Sales contracts
  • Fiscal and regulatory
    • Cash Flow
    • Discount rate and date
    • Inflation rate
    • Oil price
    • Gas Price
    • Global Economic Model (GEM) file
  • Economic analysis

Tables and charts

This report includes 26 images and tables including:

  • Key facts: Table 1
  • Index Map
  • Block 12W Map
  • Well data: Table 1
  • Reserves and resources: Table 1
  • Production: Table 1
  • Production: Table 2
  • Production Profile
  • Exploration Costs
  • Sales contracts: Table 1
  • Fiscal and regulatory: Table 1
  • Fiscal and regulatory: Table 2
  • Fiscal and regulatory: Table 3
  • Fiscal and regulatory: Table 4
  • Cash flow
  • Economic analysis: Table 2
  • Economic analysis: Table 3
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2024
  • Remaining Revenue Distribution (Discounted at 10% from 01/01/2024)
  • Remaining PV Price Sensitivities
  • Participation: Table 1
  • Costs: Table 4
  • Costs: Table 2
  • Costs: Table 3

What's included

This report contains:

  • Document

    Block 12W (Chim Sao and Dua)

    PDF 6.15 MB

  • Document

    Block 12W (Chim Sao and Dua)

    XLS 881.50 KB