Block 26
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
- Key issues
-
Khurbet East
- Massive Limestone
- Butmah Formation
- Kurrachine Dolomite
- Chilou 'B' Formation
- Yousefieh
-
Al Khairat
- Khurbet East
- Yousefieh
- Al Khairat
- Exploration upside
- Khurbet East
- Yousefieh
- Al Khairat
- Key development metrics (Phase 1)
- 1 more item(s)...
- Capital costs
-
Operating costs
- Royalty
- Cost recovery
- Excess cost recovery
- Profit petroleum
- Production bonuses
- Income tax
- Cash flow
- Gas price
- Global Economic Model (GEM) file
-
Cash flow
- Phase 1
-
Indicative valuations
- Phase 2 - contingent resources
Tables and charts
This report includes the following images and tables:
-
Index MapDetail MapDevelopment area interest
-
Reservoir CharacteristicsExploration and appraisal wellsCapital Costs Pre-2017 to 2025 (US$ million)Operating Costs 2026 to 2030 (US$ million)Reserves (2P) at 01/01/2027Contingent Resources (2C) at 01/01/2027Production (2016-2025)Block 26 production profilePipeline Summary
- 9 more item(s)...
What's included
This report contains:
Other reports you may be interested in
SK405B
The SK405B PSC, located offshore Sarawak, Malaysia, hosts the Sirung and Chenda oil and gas discoveries. The block was awarded to ...
$3,720Eridu (Block 10)
The Eridu field is located 150 kilometres west of Basra in the prolific Widyan Basin. Block 10, was awarded to LUKOIL and INPEX ...
$3,720Aram
Aram was awarded to Petrobras (80% and operator) in a consortium with CNPC (20%). It holds 29 billion barrels of unrisked reserves.
$3,720