Block 6 fields (Cronos)
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
- Key Issues
-
PSC
- Türkiye's unrecognised territorial claim
- Overview
-
Reservoirs
- Calypso
- Cronos
- Zeus
- Discoveries
-
Appraisal
- Methodology
-
Cronos
- Overview
- Key development metrics
-
Zeus and Calypso
- Overview
- Key development metrics
-
Capital costs
- Development costs
- Decommissioning costs
- Cronos
-
Operating costs
- Gas sales to Egypt
- Royalty
- Cost recovery
- Profit sharing
- Corporate Income Tax
- Gas price
- 3 more item(s)...
Tables and charts
This report includes the following images and tables:
-
Index mapBlock 6 fields mapOperating Costs 2028 to 2037 (US$ million)
-
Sub-commercial fieldsBlock 6 participationHydrocarbon and reservoir qualityKey E&A well dataDiscovery summaryReserves (2P) at 01/01/2026Contingent Resources (2C) at 01/01/2026Production (2028-2037)Capital Costs 2025 to Post-2033 (US$ million)
- 9 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Block 6 (Amistad)
Block 6 (Amistad) is the only Ecuadorian shallow-water gas producer. The field is located in the centre of the Gulf of Guayaquil...
$3,720Wadi Aswad Contract Area (Block 27)
Block 27 (Wadi Aswad) is located adjacent to Occidental's Block 9 operations and to the north of PDO's vast Block 6.
$3,720Block 62 (Habiba)
The Occidental operated Block 62 (Habiba) contract area is located in central Oman, adjacent to PDO's prolific producing Kauther gas field.
$3,720