Browse LNG - upstream
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
- Key Issues
- Retention lease renewal
- Retention lease boundary shift
- Calliance
- Other Exploration
- LNG
- Domestic Gas
- Liquids
-
Emissions
- Exploration costs
-
Capital Costs
- Upstream
-
Historical costs
- FEED
- 8 more item(s)...
Tables and charts
This report includes the following images and tables:
-
Index MapTorosa/Calliance/Brecknock MapParticipation
-
Reserves (2P) at 01/01/2026Production (2032-2041)Production ProfilePipeline SummaryAnnual uncontracted LNG pricesAnnual uncontracted WA domestic gas pricesCash Flow (US$)PV Table (US$)
- 8 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Yemen LNG - Upstream
Yemen LNG (YLNG) project consists of two identical trains, each with a production capacity of 3.35 mmtpa. The LNG plant is located at ...
$3,720North Field West (LNG) - upstream
For a comprehensive overview of the entire North Field/South Pars supergiant gas field, including upstream development, infrastructure ...
$3,720North Field South (LNG) - upstream
The 16 mmtpa North Field South (NFS) LNG development is the second phase of Qatar's wider North Field Expansion project.
$3,720