Bruce Area
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key Issues
- Serica Energy planning life extension project, including future drilling
- Keith restarts production after prolonged shut-down
- Low pressure compression project matured
- Iranian Oil Company (UK) Limited participation
-
Emissions
- Wells
- Installations
-
Historical development
- Bruce
- Platforms
- Drilling
- Keith
- Rhum
-
Capital costs
- Bruce
- Keith
- Rhum
-
Decommissioning costs
- Bruce Area
-
Operating costs
- Emissions Trading Scheme (ETS)
- Operating costs - Bruce Area
- Cash flow
- Global Economic Model (GEM) file
- Bruce
- Keith
- Rhum
Tables and charts
This report includes the following images and tables:
-
Cash flow (US$ million)Cash flow PV (US$ million)Summary Table (US$)
-
Cash flow (US$ million)Cash flow PV (US$ million)Summary Table (US$)Cash flow (US$ million)Cash flow PV (US$ million)Summary Table (US$)Index mapBruce Hub mapKeith and Rhum participation
- 16 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Marlim and Voador Area
The giant Marlim oil field was developed as a high priority asset for Petrobras. It was the largest field in terms of reserves until ...
$3,720Siri Area
The Siri Area comprises of the Siri, Stine-1 and Stine-2 oil accumulations. It is located in the northern part of the Danish offshore ...
$3,720Xijiang Area
The Xijiang Area complex is located in the Pearl River Mouth Basin and comprises several mature oil fields.
$3,720