Bulleit (GC 21)
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key Issues
- Key development metrics
- Exploration and appraisal costs
- Capital costs
- Operating costs
- Cash flow
- Global Economic Model (GEM) file
- Cash Flow
Tables and charts
This report includes the following images and tables:
-
Index MapDetail MapParticipation
-
Reserves (2P) at 01/01/2026Production (2022-2031)Production ProfileCapital Costs 2019 to Post-2027 (US$ million)Operating Costs 2022 to 2031 (US$ million)Cash Flow (US$)PV Table (US$)Summary Table (US$)
- 6 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Genghis Khan (GC 652)
Genghis Khan (GC 652) makes up the western flank of the Shenzi structure in the southeastern corner of the Green Canyon protraction ...
$3,720Tahiti (GC 640)
Tahiti (GC 640) is a large subsalt oil and gas field located in the Green Canyon protraction area in the Central Gulf of Mexico. The ...
$3,720Clipper (GC 299)
Clipper (GC 299) is a small oil and gas field located in the northeast of the Green Canyon protraction area of the Central Gulf of ...
$3,720