Asset Report

Buzios

This report is currently unavailable

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

Búzios is a giant pre-salt oil and gas field located in the Santos Basin. Petrobras achieved first oil in April 2018. In 2019, a consortium formed by Petrobras (85% and operator), CNOOC (10%) and CNPC (5%) got the rights to produce under a profit share contract the surplus volumes above the 3 billion boe awarded to Petrobras (100%) under the original Transfer of Rights agreement in 2010. The original Transfer of Rights volume corresponds to around 26% of the total reserves. From September 2021 onwards, the two contracts will share production, capital costs and operational costs. For a full analysis, please assess Búzios and Búzios (Surplus) models together.

Table of contents

  • Key facts
    • Summary
    • Key issues
      • Petrobras accelerates FPSO contracting
      • Buzios 5 FPSO starts production in 2023 after construction delays
      • Petrobras accelerates equipment contracting
      • Petrobras secures Búzios surplus volumes with CNOOC and CNPC
      • Co-participation payment challenge the economics for the Surplus volumes
      • Transfer of Rights (TOR) re-valuation
  • Location maps
    • History
      • Local content
    • Reservoir
    • Hydrocarbon quality
      • Oil
      • Gas
  • Well data
    • Work commitments
    • Extended well tests
    • Oil
    • Gas
  • Production
    • Key development metrics
      • Wells
      • Facilities
    • Oil
    • Gas
    • Exploration costs
    • Capital costs
    • Operating costs
      • Field costs
      • Lease costs
      • Transportation cost
    • Oil
    • Gas
  • Fiscal and regulatory
    • Cash flow
    • Discount rate and date
    • Inflation rate
    • Oil price
    • Global Economic Model (GEM) file
    • Cash flow
      • Cash flow - Búzios
      • Cash flow - Búzios (Surplus)

Tables and charts

This report includes 32 images and tables including:

  • Key facts: Table 1
  • Index Map
  • Detail Map
  • Participation: Table 1
  • Well data: Table 1
  • Production: Table 1
  • Production: Table 2
  • Buzios - Production Profile
  • Buzios (Surplus) - Production Profile
  • Reserves and resources: Table 1
  • Costs: Table 1
  • Costs: Table 2
  • Sales contracts: Table 1
  • Participation: Table 2
  • Geology: Table 1
  • Costs: Table 3
  • Economic analysis: Table 1
  • Economic analysis: Table 2
  • Economic analysis: Table 3
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2024
  • Remaining Revenue Distribution (Discounted at 10% from 01/01/2024)
  • Remaining PV Price Sensitivities
  • Economic analysis: Table 4
  • Economic analysis: Table 5
  • Economic analysis: Table 6
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2024
  • Remaining Revenue Distribution (Discounted at 10% from 01/01/2024)
  • Remaining PV Price Sensitivities

What's included

This report contains:

  • Document

    Buzios

    PDF 5.20 MB