Asset Report

Canadon de la Escondida-Las Heras

Get this report*

$3,720

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

The Cañadón de la Escondida-Las Heras block is located in the southern San Jorge basin mature oil field. From 1999 to 2012, Repsol-YPF operated the block. The government expropriated the asset when YPF was nationalized in 2012.Crude production from the block is piped east to terminals on the Atlantic coast. Gas sales are minor and excluded from this analysis. As with most fields in the basin, infill drilling and water injection are important to slow production decline.

Table of contents

Tables and charts

This report includes the following images and tables:

  • Key facts: Table 1
  • Index Map
  • Detail Map
  • Participation: Table 1
  • Geology: Table 1
  • Exploration: Table 1
  • Reserves and resources: Table 1
  • Cash Flow
  • Economic analysis: Table 2
  • Economic analysis: Table 3
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • 8 more item(s)...

What's included

This report contains:

  • Document

    Canadon de la Escondida-Las Heras

    PDF 5.63 MB

  • Document

    Canadon de la Escondida-Las Heras

    XLS 607.50 KB