Report summary

The Chouech Es Saida oil field is located in southern Tunisia adjacent to the Algerian border and approximately 60 kilometres south of the giant El Borma field. Serinus Energy operates the field. Production is treated onsite at the Chouech Es Saida Central Processing Facility (CPF) which has a processing capacity of 5 000 b/d of oil and 14 mmcfd of gas. The treated oil is transported to Eni's El Borma field via an 80 kilometre 6 inch oil pipeline where it is tied into the In Amenas La Skhira pipeline. The operator began producing gas in 2009 after laying an 80 kilometre 6 inch gas pipeline to the gas sales point at Eni's El Borma field. Gas is transported onwards to the Ghannouche terminal near Gabes. ETAP the state oil company maintains the right to back in to the licence up to 50% when cumulative net sales exceed 6.5 million barrels. The licence expires in 2027 at which point the operator may apply to extend the contract.

What's included

This report contains

  • Document

    Chouech Es Saida

    PDF 5.18 MB

  • Document

    Chouech Es Saida

    XLS 613.00 KB

  • Document

    Chouech Es Saida

    ZIP 5.69 MB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Well data
  • Reserves and resources
  • Production
  • Development
  • Infrastructure
  • Costs
  • Sales contracts
  • Fiscal and regulatory
  • Economic assumptions
  • Economic analysis

Tables and charts

This report includes 23 images and tables including:

Images

  • Index Map
  • Detail Map
  • Production Profile
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2018
  • Remaining Revenue Distribution (Discounted at 10% from 01/01/2018)
  • Remaining PV Price Sensitivities

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Well data: Table 1
  • Reserves and resources: Table 1
  • Production: Table 1
  • Production: Table 2
  • Infrastructure: Table 1
  • Sales contracts: Table 1
  • Cash flow
  • Economic analysis: Table 2
  • Economic analysis: Table 3
  • Costs: Table 1
  • Costs: Table 2
  • Costs: Table 3
  • Costs: Table 4

You may be interested in

Asset report

West El Manzala

Asset report

Ras El Ush (Dev)

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898