Claymore Area
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key Issues
- NEO Energy and Repsol Resources UK in strategic merger
- Ongoing investment to extend field life
- Emissions reduction requirements
-
Platforms
- Development drilling
- Major maintenance projects
- Secondary recovery
- Capital costs
- Decommissioning costs
-
Operating costs
- Emissions Trading Scheme (ETS)
- Cash flow
- Global Economic Model (GEM) file
- Cash Flow
-
Cash flow (US$ million)
- Claymore
- Claymore East
- Scapa
Tables and charts
This report includes the following images and tables:
-
Platform summaryCapital Costs Pre-2016 to 2024 (US$ million)Capital Costs 2031 to 2038 (US$ million)
-
Index mapClaymore Area mapParticipation: ClaymoreParticipation: Claymore East and ScapaField characteristicsClaymore Area well dataReserves (2P) at 01/01/2026Production (2015-2024)Production profile
- 23 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Adriana/Sabina
Adriana and Sabina are located in the Halten Terrace area of the Norwegian Sea, 25 kilometres southwest of the Skarv field.
$3,720Perama project
A detailed analysis of the Perama gold mine project.
$2,250Brutus (GC 158)
Brutus (GC 158) is an oil and gas field developed using a conventional, dry-tree tension leg platform (TLP). Development work on Brutus ...
$3,720