Claymore Area
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key Issues
- Ongoing investment to extend field life
- Emissions reduction requirements
-
Platforms
- Development drilling
- Major maintenance projects
- Secondary recovery
- Capital costs
- Decommissioning costs
-
Operating costs
- Emissions Trading Scheme (ETS)
- Cash flow
- Global Economic Model (GEM) file
- Cash Flow
-
Cash flow (US$ million)
- Claymore
- Claymore East
- Scapa
Tables and charts
This report includes the following images and tables:
-
Platform summaryCapital Costs Pre-2016 to 2024 (US$ million)Capital Costs 2031 to 2038 (US$ million)
-
Index mapClaymore Area mapParticipation: ClaymoreParticipation: Claymore East and ScapaField characteristicsClaymore Area well dataReserves (2P) at 01/01/2026Production (2015-2024)Production profile
- 23 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Dumbarton Area
The Dumbarton Area includes the mature Dumbarton, Lochranza and Balloch fields 220 kilometres northeast of Aberdeen.Dumbarton is a ...
$3,720Azulao Area
The Azulão Area consists of Eneva's operated fields in the north region of Brazil.The area encompasses Azulão, ...
$3,720Siak, Langgak & CPP (Ex-CPI area)
Siak PSC, Langgak PSC, and Coastal Plains Pekanbaru (CPP) PSC are located onshore Riau in the Central Sumatra Basin and were ...
$3,720