Report summary

The Cleeton and Ravenspurn South fields are two separate accumulations developed by five steel platforms. Production is exported through a dedicated pipeline to terminal facilities at Dimlington. Cleeton was brought onstream in 1988 and Ravenspurn South in October 1989. The Ravenspurn North, Johnston, Easington Catchment Area and Ceres & Eris developments utilise the Cleeton facilities for compression and export. Cleeton ceased production in 2008 and now acts solely as an infrastructure ...

What's included

This report contains

  • Document

    Cleeton & Ravenspurn South

    PDF 614.44 KB

  • Document

    Cleeton & Ravenspurn South

    XLS 820.50 KB

  • Document

    Cleeton & Ravenspurn South

    ZIP 1.29 MB

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Location maps
  • Participation
  • Geology
  • Well data
  • Reserves and resources
  • Production
    • Platforms
    • Development Drilling
    • Third Party/Satellite Development
  • Infrastructure
    • Capital Costs
    • Decommissioning
    • Operating Costs
  • Sales contracts
    • Development Approval after 1 April 1982 but prior to 15 March 1993
    • The Budget
    • Cash flow
    • Discount rate and date
    • Inflation rate
    • Gas price
    • Carbon price
    • Exchange rate
    • Fiscal terms
    • Global Economic Model (GEM) file
    • Cash Flow

Tables and charts

This report includes 26 images and tables including:

Images

  • Index Map
  • Cleeton/Ravenspurn South Map
  • Production Profile
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2018
  • Remaining Present Value Price Sensitivities

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Geology: Table 1
  • Well data: Table 1
  • Reserves and resources: Table 1
  • Production: Table 1
  • Production: Table 2
  • Infrastructure: Table 1
  • Development: Table 1
  • Development: Table 2
  • Costs: Table 1
  • Costs: Table 2
  • Costs: Table 3
  • Cash Flow (US$ million)
  • Economic analysis: Table 2
  • Economic analysis: Table 3
  • Cash Flow (£ million)
  • Economic analysis: Table 5
  • Economic analysis: Table 6

You may be interested in

Asset report

Alder

Asset report

Alta

    
            
            
            
            
            
            
            
            
    

Questions about this report?

    • Europe:
      +44 131 243 4699
    • Americas:
      +1 713 470 1900
    • Asia Pacific:
      +61 2 8224 8898