CPE-6
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
- Key Issues
- Frontera adds a solar park in CPE-6 area
- Frontera development plans for Colombia
- Challenges of heavy oil
- History
- Reservoir
- Drive mechanism
- Wells
- Facilities
- Operating costs
- Cash Flow
Tables and charts
This report includes the following images and tables:
-
Index MapDetail MapParticipation
-
Field Hydrocarbon CharacteristicsReserves (2P) at 01/01/2026Production (2015-2024)Production ProfileCapital Costs Pre-2016 to 2024 (US$ million)Operating Costs 2024 to 2033 (US$ million)Cash Flow (US$)PV Table (US$)
- 5 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Sergipe-Alagoas deepwater
This report includes seven deepwater light oil and gas field discoveries by Petrobras.
$3,720Albacora Area
Albacora was one the first major deep-water developments undertaken by Petrobras. Its discovery in 1984, along with Marlim in the ...
$3,720Cleaver Bank High Project
The Cleaver Bank High Project comprises the Carrack and Cutter gas fields. The latter is tied back to Carrack, which is tied back ...
$3,720