Cygnus
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key Issues
- Ithaca takes greater control of Cygnus
- Upside potential from infill drilling beyond the next three approved wells
- Government widens gas entry requirements for National Transmission System (NTS)
- Cygnus is a very low emitter
- Licence and unitisation
-
Corporate
- Low pressure compression project
- Capital costs
- Decommissioning costs
- Operating costs
- Cash flow
- Global Economic Model (GEM) file
- Cash Flow
- Cash flow (US$ million)
- Cash flow (£ million)
Tables and charts
This report includes the following images and tables:
-
Hydrocarbon and reservoir qualityReserves (2P) at 01/01/2026
-
Contingent Resources (2C) at 01/01/2026Production (2016-2025)Production profileCapital Costs Pre-2016 to 2024 (£ million)Capital Costs 2031 to 2037 (£ million)Operating Costs 2025 to 2032 (£ million)Annual gas pricesCash Flow (US$)PV Table (US$)
- 13 more item(s)...
What's included
This report contains: