Cygnus
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key Issues
- Ithaca takes greater control of Cygnus
- Upside potential from infill drilling beyond the next three approved wells
- Government widens gas entry requirements for National Transmission System (NTS)
- Cygnus is a very low emitter
- Licence and unitisation
-
Corporate
- Low pressure compression project
- Capital costs
- Decommissioning costs
- Operating costs
- Cash flow
- Global Economic Model (GEM) file
Tables and charts
This report includes the following images and tables:
-
Hydrocarbon and reservoir qualityReserves (2P) at 01/01/2026
-
Contingent Resources (2C) at 01/01/2026Production (2017-2025)Production profileCapital Costs 2019 to 2025 (US$ million)Capital Costs 2031 to 2038 (US$ million)Operating Costs 2026 to 2034 (US$ million)Annual gas pricesCash Flow (US$)PV Table (US$)
- 10 more item(s)...
What's included
This report contains: