Djambala/Foukanda/Mwafi
This report is currently unavailable
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
- Key Issues
- Djambala fields
- Foukanda
- Mwafi
- Gas export
- Capital costs
- Operating costs
- Cash flow
- Global Economic Model (GEM) File
- Cash Flow
- Djambala Cash Flow
- 3 more item(s)...
Tables and charts
This report includes the following images and tables:
-
Index mapDjambala, Foukanda and Mwafi mapDjambala II, Foukanda II and Mwafi II current participation
-
Field hydrocarbon characteristicsReserves (2P) at 01/01/2026Contingent Resources (2C) at 01/01/2026Production (2015-2024)Djambala production profileFoukanda production profileMwafi production profileSchematic diagram of Congo pipeline system
- 23 more item(s)...
What's included
This report contains: