Asset Report

Easington/Dimlington Gas Terminals

Get this report

$1,700

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- Available as part of a subscription
- FAQ's about online orders

01 November 2017

Easington/Dimlington Gas Terminals

Report summary

The Easington and Dimlington gas terminal facilities share a common site, located to the north of Easington village in Humberside. There are three terminals, Centrica's Easington Rough, BP's Easington and Perenco's Dimlington terminal.The terminals collectively receive gas from 22 fields, including Ormen Lange in Norway. Future users include the Aasta Hansteen field in the Norwegian Sea, where gas volumes will be exported through the 480 kilometre Polarled pipeline to the ...

Table of contents

  • Key facts
  • Summary
  • Location maps
  • Participation
    • Terminals
      • Easington/Dimlington Terminals
      • Amethyst and Rough Systems
      • Rose and Helvellyn
      • Ormen Lange and Norwegian Volumes
    • Pipelines
      • Cleeton System
      • Easington Catchment Area Project
      • West Sole/Amethyst/Rough Systems
      • Ormen Lange
    • Terminal
      • BP-operated Easington facilities
      • Centrica-operated Easington facilities
      • Future Potential
      • Dimlington Terminal

Tables and charts

This report includes 5 images and tables including:

  • Key facts: Table 1
  • Easington/Dimlington Terminals
  • Development: Table 1
  • Throughput: Table 1
  • Throughput: Table 2

What's included

This report contains:

  • Document

    Easington/Dimlington Gas Terminals

    PDF 347.30 KB

  • Document

    Easington/Dimlington Gas Terminals

    XLS 215.50 KB

  • Document

    Easington/Dimlington Gas Terminals

    ZIP 486.65 KB

Other reports you may be interested in

Browse reports by Industry Sector