Asset Report

Easington/Dimlington Gas Terminals

Get this report

$2,150

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQ's about online orders
- Find out more about subscriptions

07 May 2019

Easington/Dimlington Gas Terminals

Report summary

The Easington and Dimlington gas terminal facilities share a common site, located to the north of Easington village in Humberside. There are three terminals, Centrica's Easington Rough, BP's Easington and Perenco's Dimlington terminal.The terminals collectively receive gas from over 20 fields, including Ormen Lange in Norway. Gas from the Aasta Hansteen field in the Norwegian Sea is also exported through the 480 kilometre Polarled pipeline to the Nyhamna gas terminal, prior to ...

Table of contents

  • Key facts
  • Summary
  • Location maps
  • Participation
    • Terminals
      • Easington/Dimlington Terminals
      • Amethyst and Rough Systems
      • Rose and Helvellyn
      • Ormen Lange and Aasta Hansteen
    • Pipelines
      • Cleeton System
      • Easington Catchment Area Project
      • West Sole/Amethyst/Rough Systems
      • Norwegian Gas
      • Future pipeline infrastructure
    • Terminal
      • BP-operated Easington facilities
      • Spirit Energy-operated Easington facilities
      • Dimlington Terminal

Tables and charts

This report includes 5 images and tables including:

  • Key facts: Table 1
  • Easington/Dimlington Terminals
  • Development: Table 1
  • Throughput: Table 1
  • Throughput: Table 2

What's included

This report contains:

  • Document

    Easington/Dimlington Gas Terminals

    PDF 1.78 MB

  • Document

    Easington/Dimlington Gas Terminals

    XLS 142.00 KB

  • Document

    Easington/Dimlington Gas Terminals

    ZIP 1.73 MB

Trusted by leading organisations