Ecopetrol - Llanos Heavy Oil Project
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key Issues
- Ecopetrol added a gas-powered energy generation plant to power operations
- Importance of heavy oil for Ecopetrol
- Cost reduction
- History
- Castilla
- Chichimene
- Apiay block fields
- Dilution
- Operating costs
- Cash flow
- Global Economic Model (GEM) file
-
Cash Flow
- Cash Flow for Castilla
Tables and charts
This report includes the following images and tables:
- Field Hydrocarbon Characteristics
- Reserves (2P) at 01/01/2026
- Production (2015-2024)
- Production Profile: Castilla
- Production Profile: Apiay Area
- Production Profile: Chichimene
- Capital Costs Pre-2016 to 2024 (US$ million)
- Operating Costs 2024 to 2033 (US$ million)
- Cash Flow (US$)
- PV Table (US$)
- Summary Table (US$)
- 21 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Ecopetrol - Tello
The Tello contract area encompasses the mature Tello oil field and the smaller La Jagua oil field, both of which are producing. ...
$3,720Ecopetrol - Other Fields
This analysis includes Ecopetrol's wholly-owned, small assets not covered in separate analyses. Most are operated by ...
$3,720Cano Sur Este
Cano Sur Este is a much-delayed heavy oil project and one of the few greenfield growth opportunities in Ecopetrol's portfolio. ...
$3,720