El Dorado
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key Issues
- Exports to Argentina coming to an end
- Bolivia's mature fields are in steep decline
- Historic
- Wells
- Facilities
- Exploration costs
- Capital costs
-
Operating Costs
- Gas
- Domestic market
- Exports to Argentina
- Exports to Brazil
- Liquids
- Cash flow
- Global Economic Model (GEM) file
- Cash Flow
Tables and charts
This report includes the following images and tables:
-
Field Hydrocarbon CharacteristicsReserves (2P) at 01/01/2026
-
Contingent Resources (2C) at 01/01/2026Production (2015-2024)Production ProfileCapital Costs Pre-2016 to 2024 (US$ million)Operating Costs 2024 to 2033 (US$ million)Cash Flow (US$)PV Table (US$)Summary Table (US$)Split of Revenues
- 9 more item(s)...
What's included
This report contains:
Other reports you may be interested in
YPFB Chaco Operated Areas
YPFB Chaco operates a range of assets across the Tarija basin in Bolivia. This analysis covers only its 100% operated assets. Other ...
$3,720El Soldado copper minesite
A detailed analysis of the El Soldado copper minesite.
$2,250El Teniente copper minesite
A detailed production and cost competitive analysis of the El Teniente copper minesite.
$2,250