Asset Report

EPSA Area A (82)

This report is currently unavailable

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

EPSA Area A, formerly known as Block 82, is located onshore in Libya's Sirte Basin, 60-kilometres east of the Bu Attifel field. Eni has developed eight fields on the block.Production began in 1984 and peaked in the late 1990s. Although production is currently in decline, the acreage retains some exploration upside, and existing fields have the potential to produce at higher rates through artificial lift.In 2008, Eni signed an agreement with NOC to extend its existing contracts in Libya. ...

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Location maps
    • Contract extension
  • Geology
  • Well data
  • Exploration
  • Reserves and resources
  • Production
    • Key development metrics
      • Wells
      • Facilities
  • Infrastructure
    • Exploration Costs
    • Capital Costs
    • Operating Costs
    • Original licence
    • Licence extension
      • Distribution of costs
      • Production sharing
    • Signature Bonus
    • Cash Flow
    • Discount rate and date
    • Inflation rate
    • Oil price
    • Global Economic Model (GEM) File
  • Economic analysis

Tables and charts

This report includes 26 images and tables including:

  • Key facts: Table 1
  • Index map
  • EPSA Area A (Block 82) map
  • Geology: Table 1
  • Geology: Table 2
  • Well data: Table 1
  • Exploration: Table 1
  • Reserves and resources: Table 1
  • Reserves and resources: Table 2
  • Production: Table 1
  • Production: Table 2
  • Production profile
  • Infrastructure: Table 1
  • Cash Flow
  • Economic analysis: Table 2
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2024
  • Remaining Revenue Distribution (Discounted at 10% from 01/01/2024)
  • Remaining Present Value Price Sensitivities
  • Participation: Table 1
  • Costs: Table 1
  • Costs: Table 2
  • Costs: Table 3
  • Fiscal and regulatory: Table 1
  • Fiscal and regulatory: Table 2

What's included

This report contains:

  • Document

    EPSA Area A (82)

    PDF 5.12 MB