ETAP (BP)
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key Issues
- Murlach (Skua) re - development started production in H2 2025
- Seagull brought onstream after lengthy delays
- Further development and drilling expected
- BP drops ETAP electrification
- Future exploration
- Exploration history
- Machar
- Madoes
- 6 more item(s)...
- Capital costs
- Decommissioning costs
-
Operating costs
- Marnock CPF opex cost share
- Cash Flow
- Global Economic Model (GEM) file
-
Cash Flow
- Machar
- Madoes
- Marnock
- Mirren
- Monan
- Mungo
- Murlach
Tables and charts
This report includes the following images and tables:
-
Capital Costs 2016 to 2025 (£ million)Capital Costs 2036 to 2042 (£ million)
-
Index mapETAP BP mapField participationField characteristicsDiscovery wellsDiscovery summaryReserves (2P) at 01/01/2026Production (2015-2024)ETAP (BP) production profile
- 24 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Seagull
The Seagull high pressure/high temperature (HP/HT) field lies in the Central North Sea, 17 kilometres south of the ETAP (BP) Central ...
$3,720Blind Faith (MC 696)
Blind Faith (MC 696) is an oil field in the eastern half of the Mississippi Canyon protraction area in the Central Gulf of Mexico, 31 ...
$3,720North Oil Company operated assets
North Oil Company (NOC) operates several oil fields in the Kirkuk province. This report includes the Kirkuk, Bai Hassan, Jambur and ...
$5,280