Asset Report

ETAP (BP)

Get this report*

$5,280

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

The Eastern Trough Area Project (ETAP) was established to develop several oil and gas accumulations which were unlikely to prove commercial on a standalone basis. Phase one of the joint development comprised of seven fields: Machar, Marnock, Mungo and Monan (operated by BP), and Egret, Heron and Skua (operated by Shell, but now ceased). Two further BP-operated fields, Mirren and Madoes, formed phase two of the development. The Marnock field is the hub for the ETAP development. Two platforms ...

Table of contents

  • Summary
    • Murlach (Skua) re - development started production in H2 2025
    • Seagull brought onstream after lengthy delays
    • Further development and drilling expected
    • BP drops ETAP electrification
    • Future exploration
    • Exploration history
    • Machar
    • Madoes
    • 6 more item(s)...
  • Capital costs
  • Decommissioning costs
    • Marnock CPF opex cost share
  • Cash Flow
  • Global Economic Model (GEM) file
    • Machar
    • Madoes
    • Marnock
    • Mirren
    • Monan
    • Mungo
    • Murlach

Tables and charts

This report includes the following images and tables:

    Capital Costs 2016 to 2025 (£ million)Capital Costs 2036 to 2042 (£ million)
    Index mapETAP BP mapField participationField characteristicsDiscovery wellsDiscovery summaryReserves (2P) at 01/01/2026Production (2015-2024)ETAP (BP) production profile
  • 24 more item(s)...

What's included

This report contains:

  • Document

    ETAP (BP)

    XLS 1.88 MB

  • Document

    ETAP (BP)

    PDF 2.54 MB